McKim & Creed (formerly Landmark Science & Engineering) was selected to develop the Summit Campus – a new 142-acre pre-K to 12 full school campus in southwestern New Castle County, off S.R. 896, named for its proximity to Summit Aviation.
Phase I construction includes Crystal Run Elementary School (90,5000+/- SF), full site entrance on Summit Bridge Road, off-site road improvements, off-site sewer improvements, and a portion of the site improvements. Vehicle and pedestrian improvements include inner and outer loop drives as well as multimodal paths throughout campus.
Our team provided planning, surveying, environmental services including forest stand delineation, wetland delineation, permitting coordination across state and federal agencies, and bog turtle investigations, site design, stormwater management BMP design, and DelDOT entrance design. A Site Record Plan has been recorded and Site Construction Plans were prepared for Phase I construction. Construction phase services were provided including survey stakeout, as-builts, and CCR services.