mechanical system upgrades
multi-use pathway
Federal Navigation

Government

Governments are often responsible for mission-critical infrastructure projects that impact lives in our communities, states and country.

McKim & Creed offers full-service engineering and geomatics services to all branches of government. We have worked in thousands of communities and nearly all 50 states, meeting the infrastructure challenges of the 21st century.

Projects

Low-Impact Bridge Replacement Projects

Exeter Township GIS Reconfiguration, Database Enhancement and Migration

Climate Resiliency Survey and Analysis

NC 12 Breaches Emergency Response

Inland Rivers Marine Terminal Storage Facility

Northpark Reconstruction Project (T-1014)

Enterprise GIS and Asset Management Program

Transmission Line Relocation for Cranes

Fish Bayou Control Structures

Stormwater Collection Systems Inspections at Arlington National Cemetery

Hudson River Federal Navigation Hydrographic Survey

SCADA System Cybersecurity Audit

VTSCADA HMI Application

Eno River Outfall and Lift Station Upgrades

Sea Bright to Manasquan Beach Profile Survey

Fort Gordon Energy Resilience Project

Fort Stewart Solar Project

Lead and Copper Rule Revisions Program Assistance

Esopus Creek Hydrographic Multibeam Survey

Lead and Copper Rule Program Service Line Material Inventory

Non-Revenue Water Loss Recovery

Montgomery County Resource Recovery Facility (MCRRF)

USPS Fayetteville Processing and Distribution Center Mechanical System Upgrades

North Carolina Veterans Park

East Asheville Library MEP-FP Design and Third-Party Commissioning

North Garner Dog Park

Multi-Use Pathway and Wetlands Trail Boardwalk

Hendersonville Solids Management Plan

As-Built Survey for Industrial Site at Port

Avery County High School Renovations

North Carolina Center for Automotive Research (NCCAR)

Paw Creek Outfall Replacement

NCNG Joint Forces Headquarters and State EOC

McAlpine Creek Relief Sewer

OWASA HVAC Alternative Energy Source

Orange Avenue Road Redesign and Utility Replacement

Fort Eustis Wastewater Collection System Flow Meters & Hydraulic Modeling

Pipe Loop Corrosion Study

West Lac Allemands Shoreline Protection Project

Water Service Line Replacement

Comprehensive Wastewater Expansion with Environmental Enhancement Facility

Bald Head Island Conservancy’s Barrier Island Study Center

Galvanized Water Main Pipe Replacement

Elevated Water Tank, One Million Gallon Pedisphere and Water Transmission Mains

Hurricane Florence Emergency Response Services

Galvanized Water Line Replacement